HOME > Simulation

Simulation

Production/Distribution Solution Field

Manufacturing process simulation using general-purpose simulator WITNESS: supports the optimum production system

How WITNESS works

  • Evaluation/ review of facility
    planning and production schedule
  • Personnel positioning planning
    Building Decision Support Systems for solving challenging problems, in areas such as production scheduling, logistics and supply chain or manpower planning. In most practical situations, these problems, within a resource optimization framework, are both very computationally complex and highly evolutive over time.

How CHIP works

CHIP V5, the Second-Generation Constraint Programming tool, offering the concept of Global Constraints in an Open Architecture environment, providing the world's most advanced Constraint Solving system.

With CHIP V5 Constraint Programming technology has moved effectively onto its Second Generation.Two key contributing factors are the introduction of Global Constraints and its implementation within an Open Architecture.